22.5% raised of 1.5million
$572,767.38** received in building fund.
Lewis County Adventist School
2104 South Scheuber Road
Chehalis, Washington
BUILDING COMMITTEE REPORT.
1/20/2010
If we have $1.500.000 in the bank by May 31, 2010 we will tear down the old school and start construction THIS SUMMER. Some of the funds have already been spent on Design, Water system upgrades, Water for Fire protection, and Geology studies.
You might ask, "what can I do to speed the process along?"
You might say, "But I don't have a lot of capital."
Who did Christ say gave the most? It wasn't the pompous Pharisee. It was the widow that gave all she had. God can bless any gift regardless of size and multiply it. He multiplied the few loaves and fishes.
Every dime helps.
LCAS STUDENTS - Keep up the good work with the coins!
TOGETHER WE CAN! We pray God's blessing upon this project.
Donate through your church:
Donate Online on this site with ONLINE GIVING
Thank you in advance for your generosity. back to top
**Estimated cost of building $3,500,000
Immediate Goal is $1,500,000 IN THE BANK by May 31 to begin construction.
Of the amount donated $234,788.19 has been spent.
The balance of the estimated cost would be borrowed at 6% over 20 years from the North Pacific Union Conference of Seventh-day Adventists.
$572,767.38 - $234,788.19 = $337,979.19 which is 22.5% of $1.500,000